Left Somerset at 1000 hrs and had a clear run up the M5/M6 arriving back at the boat at 1300 hrs. First job was to light the fire, then we installed secondary glazing to the side hatch and one of the windows, we will try and complete the job tomorrow.
Got a message to say our new chimney is now ready for collection so we shall pick it up tomorrow.
Subscribe to:
Post Comments (Atom)
Sunshine and Ice
Stop planks at Aston lock. Canal is frozen solid with 3" thick ice. During last weeks cold snap we had a little frost forming on the ...
-
Stop planks at Aston lock. Canal is frozen solid with 3" thick ice. During last weeks cold snap we had a little frost forming on the ...
-
The Epping stoves firebricks need replacing, I had done a temporary bodge repair over the last two winters by cementing the cracks. It...
-
The last two days cruising we have taken a battering from the element's. Yesterday it was very wet, luckily there was no wind to accomp...
No comments:
Post a Comment